50000 c) zero A foundation may fail due to (a) change of strata (b) differential loading system (c) unsymmetrical loading system c) We|l blasted rock

Which of the following is not a PERT event ? Ans: a, 82. Which one of the following surfaces will give highest coefficient of traction while using crawler track tractors?

Ans: a, 58. a) Rs.1740

a) 30 kg In the time-cost optimisation, using CPM method for network analysis, the crashing of the activities along the critical path is done starting with the activity having Sensitivity analysis is a study of Ans: a, 47. c) Rs. (iii) Bull wheel

a) Bulldozer d) 1,3,4, 2 Home » Construction Planning and Management Questions » 300 TOP Construction Planning and Management Objective Questions and Answers, 1. a) 3425 kg Practice Test: Question Set - 01 1. a) Rs. PERT is preferred for planning because of d) Rs. b) shaping and trimming 1. greater than Total Float. a) 1, 2,3, 4, 5, 6 and 7 respectively d) Dipper shovel b) Rs. a) 500 cum this will almost cover all the topics of building construction. (a) spread footing (b) strip footing (c) raft (d) grillage. c) A is true but R is false. Answer: Option C The correct sequence of these operations in tunnel construction is d) standard time Ans: a, 45. b) 97.7% and 84.1% 2. progress of work can be measured. c) Critical activities control the project duration.

b) 4.23 years b) 1 and 4 are correct c) less than X d) 5 a) site investigation started

Ans: a, 94. Crash project duration is obtained by summing the c) Clam shell Ans: d, 35. c) should invest in project A 04. b) (i), (ii) and (iv) are correct Ans: d, 52. D All the above . Ans: c, 61.

In the network shown in Fig. Time required need not be known. Answer: Option C (ii) Boom Which one of the following is not an excavating and moving type of equipment ? For which of the following materials, the output of power shovels for a fixed shovel size will be maximum a) 1,2,4,3,5 Mobilization advance up to 10% of the cost of work is given to a contractor

c) both resources and project duration time If the optimistic time, most likely time and pessimistic time for activity A are 4, 6 and 8 respectively and for activity B are 5, 5.5 and 9 respectively, then, a) expected time of activity A is greater than the expected time of activity B

d) Start float and finish float are the differences between activity times and not event times. Consider the following statements : 15.

a) comparison of profit and loss

c) Rs. Ans: b, 78.

If an activity has its optimistic, most likely and pessimistic times as 2, 3 and 7 respectively, then its expected time and variance are respectively

Rising Cost of Construction 5.

c) may be longest Scraper wheels : 10000 kg

c) increase by 250 kg a) reduce by 200 kg a) 1,2 and 3 are correct d) the contract documents for inviting tenders

c) (ii) and (iii) are correct a) 0 c) activity 2—3 is completed d) class is being attended d) critical path scheduling b) increasing the direct cost and decreasing the indirect cost

1. The basic action involved in sheep foot rolling is 2 per cum. b) 5515 kg b) Rs. b) less than 50% The book value of the excavator at the end of 3 years using general double declining balance method is

c) Scraper Practice Test: Question Set - 05 1. d) none of the above 05. c) 1,2 and 3 are correct Answer: Option B b) free float Its book value at the end of two years of its useful life (as per straight line method of evaluation of depreciation) will be a) Rs. a) the detailed estimated cost based on detailed design a) crash time d) independent float c) 21 minutes Building Materials and Construction, Civil Engineering Multiple Choice Questions / Objective type questions, MCQ's, with question and answers, download free PDF, Civil Engineering, Multiple Choice Questions, Objective type questions, Civil Engineering short notes, rapid fire notes, best theory.

Ans: c, 63. B 20 kg limestone is required .

Ans: d, 43. The quantity of earth for which the cost of excavation by machine will be equal to the cost of manual excavation is If the output of a dragline for 90° angle of swing at optimum depth of cut is X, then the output for 120° angle of swing at 120 % of optimum depth of cut will be b) Pressing Building Materials and Construction Questions and Answers 1. Ans: d, 27. d) 7.87 years

c) more than 50% 4. d) 16 days PERT technique of network analysis is mainly useful for Projects are of the non-repetitive type.

Ans: c, 20. Batching refers to 1,000/-. a) Rs.

Ans: b, 40. c) the soil survey, traffic survey, concept design and approximate cost c) 3.5 and 25/36 c) Rs.

Ans: c, 31. b) normal time b) 2 and 3 are correct b) Rs.

d) reduce by 250 kg b) Shovel d) 9 b) Sand and gravel c) variation in total cost of the project on an ad hoc basis a) most likely time 7,600/-

Ans: c, 21. If the expected time of completion of a project is 60 weeks with a standard deviation of 5 weeks, the probability of completing the project in 50 weeks and 65 weeks respectively will be Ans: a, 38. b) resource smoothening

Ans: a, 54. Total float for any activity is defined as the difference between The reduction in project time normally results in The process of incorporating changes and rescheduling or replanning is called c) Asphalt 13. An excavator costs Rs. a) Drag line a) 2.3% and 84.1% Consider the following statements: d) 1 and 2 are correct c) Start float and finish float need not be equal. The tension in the tow cable is 720 kg.

d) Rs.

a) change of critical path a) Both A and R are true and R is the correct explanation of A. d) its earliest finish time and latest start time for its successor activity Ans: b, 42. Ans: c, 39. c) Good common earth d) Wet sticky clay c) 1 and 4 are correct The most suitable type of equipment for compaction of cohesive soils is Ans: c, 55. (below fig), the critical path is, a) 1-2-3-4-5-6 c) both A and R are correct a) resources 7.5, the activity 6-8 can be started only when d) none of the above 50,000/-.What uniform annual amount must be set aside at the end of each of the 10 years for replacement if the interest rate is 8% per annum and if the sinking fund factor at 8% per annum interest rate for 10 years is 0.069 ? d) none of the above Select the incorrect statement. Free float is mainly used to

c) for the payment of advances to labour and other staff a) activity 4—6 is completed (ii) decreased if drawbar HP of the tractor is increased for a given hauling distance Construction Planning and Management Interview Questions. Assume grade resistance factor = 10 kg/tonne. Ans: d, 14. c) increasing the direct cost and indirect cost both In the network shown in Fig. d) (i) and (iv) are correct Ans: b, 11.

a) Earliest start of an activity is the early event time of the node it leaves.

a) 50% 4. Which of the following earth moving machines has the shortest cycle time? b) Total float can be either start float or finish float. Slack time refers to (iii) Output can be increased by keeping the depth of cut less than optimum depth,

Ans: c, 87. a) 3.5 and 5/6 A machine is purchased for Rs. c) Dragline Placing concrete d) Rs.

Ans: c, 95. Construction of parapet wall in terrace

Ans: c, 96. d) none of the above Consider the following statements for a power shovel: Building Construction Objective Questions and Answers Pdf :-1. c) 1,2,3,4,5 d) deterministic activities Ans: b, 73.

b) Rs. 2. c) 1,2, 3, 5, 6,4 and 7 respectively Drilling If the gross vehicle weight of a truck is 30 t and rolling resistance is 30 kg/tonne, then the tractive effort required to keep the truck moving at a uniform speed is c) 99.9% (adsbygoogle = window.adsbygoogle || []).push({}); Engineering interview questions,Mcqs,Objective Questions,Class Lecture Notes,Seminor topics,Lab Viva Pdf PPT Doc Book free download.

Famous New York Cheesecake Recipe, Hill Stations Near Bangalore Within 100 Kms, Hillshire Farms Turkey Kielbasa, Garfield Comic October 15 1999, How To Make Fish Cakes Without Bread Crumbs, Mahler Symphony 8 Movements, Pc Engine Cd Roms, Green Bean Potato Frittata, Palmers Olive Oil Formula With Vitamin E, Acetic Acid Conductivity Concentration, What Brand Has A Palm Tree Logo, Kirk Hammett Ouija Guitar Ltd,